Special exception permits in Somerset: application checklist
A proposed use can fit the general character of a Somerset County property and still require more than a standard zoning certificate.

That is the point at which many applicants first encounter a Somerset County special exception: the use may be allowed in a zoning district, but only after the Board of Zoning Appeals reviews the site, hears public testimony, and decides whether the proposal meets the county’s requirements.
The process is not simply a request for permission. It is a structured review of how a particular use will fit on a particular parcel—how vehicles will enter and leave, where buildings and parking will sit, whether forests or sensitive habitats are affected, and what conditions may be needed to protect nearby properties. If you are building an application, the most useful approach is to work through the requirements in order rather than treating the public hearing as the first real step.
Start with the use and the correct zoning section
Before preparing drawings or scheduling a hearing, identify exactly what you want to do and where the Somerset County Zoning Ordinance places that use.
A special exception application must be submitted in writing to the Somerset County Board of Zoning Appeals, commonly called the BZA. The application needs to identify the specific section of the zoning ordinance under which the exception is being requested and explain the grounds for the request.
That means “commercial use” or “new facility” is usually not enough as a description. The county needs to understand the actual activity, its scale, the buildings involved, the hours and patterns of operation, and the way the property will function once the project is complete. A poultry operation, a temporary travel trailer, a solar installation, and another type of commercial activity may all raise entirely different questions under the ordinance.
A useful first pass is to write down:
- The parcel’s address and tax account information.
- The current zoning district.
- The proposed use in plain language.
- The zoning ordinance section that identifies the use as requiring a special exception.
- The size and number of proposed structures.
- The expected number of employees, residents, customers, or visitors.
- The anticipated traffic, deliveries, equipment, and operating schedule.
- Any related permits, approvals, or environmental reviews that may be triggered.
This early description becomes the backbone of the application. It also gives nearby residents something understandable to respond to when notice and public hearing materials are issued. Clear information does not guarantee agreement, but it makes the process more productive for everyone.
A special exception is not a shortcut around zoning. It is the county’s way of examining whether a specifically identified use can work on a specific site under specific conditions.
Understand who is navigating the board
The Somerset County Board of Zoning Appeals is made up of three members and one alternate. Members are appointed by the Board of County Commissioners and serve three-year terms.
The BZA is the decision-making body for a special exception. County staff may help identify missing materials, explain submission procedures, and coordinate technical review, but the board is responsible for considering the application through the public hearing process and deciding whether the request should be approved, denied, or approved with conditions.
That distinction matters because applicants sometimes spend most of their energy assembling a packet and too little time preparing to explain the proposal. The board is not only looking for a complete folder. It is evaluating whether the requested use satisfies the applicable standards and whether the site plan responds to foreseeable impacts.
When you prepare, think about the questions a board member would reasonably ask:
- Does the proposed use belong in this zoning district under the ordinance?
- Is the size of the operation consistent with the use being requested?
- Can emergency vehicles, customers, employees, and deliveries use the access safely?
- Will the proposal create noise, lighting, odor, dust, or activity that affects surrounding properties?
- Are parking, loading, storage, and refuse areas shown clearly?
- Does the site plan leave enough room for required setbacks, landscaping, drainage, and environmental protections?
- Can the project meet other county and state requirements, rather than relying on the special exception to solve every issue at once?
You do not need to predict every concern or present the project as flawless. You do need to show that the proposal has been thought through and that the drawings match the written description.
Build a working application file
The county’s exact fee schedule and the name or number of a standalone special exception checklist should not be assumed if they are not provided in the current application materials. Confirm the current filing instructions with the appropriate county office before submitting, and keep a copy of everything delivered.
Your working file should include:
1. The completed written application. Name the requested use, cite the relevant zoning ordinance section, and state why the request is being made.
2. A complete site plan. The plan should show the physical arrangement of the property and proposed improvements with enough detail for review.
3. Supporting technical materials. Include documents required for forest conservation, Critical Area review, grading, sediment control, access, drainage, or other applicable approvals.
4. Ownership and authorization information. If the applicant is not the property owner, document the owner’s authorization in the form required by the county.
5. Payment of required fees and charges. A zoning application cannot move forward with unpaid costs, charges, fees, or expenses.
6. A record of communication. Save submission confirmations, correction notices, revised drawings, and correspondence about outstanding items.
A complete application is more than a form with a signature. It is a package that allows the county and the BZA to understand the proposal without filling in major gaps themselves.
Complete environmental and forest conservation prerequisites first
One of the most important parts of the Somerset County special exception checklist is the environmental work that may need to happen before the zoning application can proceed.
Under the county’s Forest Conservation Ordinance, a forest stand delineation and forest conservation plan must be prepared and approved when applicable. The county will not allow a zoning application or BZA special exception application to proceed until those documents have been addressed as required.
The Forest Conservation Ordinance applies to development projects or activities requiring a subdivision, grading permit, or sediment control permit on areas of 40,000 square feet or greater outside the Chesapeake Bay Critical Area. That threshold is roughly 0.92 acres, but the practical question is not simply whether the parcel is large. The question is whether the proposed activity falls within the ordinance’s scope and triggers the associated review.
A forest stand delineation identifies existing forest resources on the site. A forest conservation plan then addresses how the project will avoid, minimize, or otherwise handle forest impacts under the applicable requirements. These are not decorative attachments to the zoning packet. They can influence where buildings, drives, stormwater facilities, and other improvements are placed.
If the project is inside the Chesapeake Bay Critical Area or may affect Critical Area resources, additional review may apply. Somerset County’s Critical Area Program can also require measures related to threatened or endangered species of concern. If the Department of Technical and Community Services determines that such species may be affected, the applicant must include protection measures in the project design or explain why those measures are not necessary.
Before finalizing a site plan, ask the design team and county reviewers:
- Is the property inside or near the Chesapeake Bay Critical Area?
- Does the project disturb enough land to trigger forest conservation review?
- Will grading, sediment control, or subdivision approval be required?
- Are existing forest stands, wetlands, waterways, or habitat areas shown?
- Has the necessary forest stand delineation been prepared?
- Has the forest conservation plan been prepared and approved, if required?
- Has the county identified a threatened or endangered species concern?
- Are the environmental measures reflected on the actual site plan, rather than only described in a separate report?
A common mistake is to treat environmental review as something that can be added after the BZA hearing. In practice, the environmental constraints may determine whether the proposed layout is workable at all. Starting early gives you time to adjust the project before the drawings are locked into a hearing packet.
Make the site plan answer practical questions
A site plan is where the proposal becomes physical. It shows what will be on the land, how people will move through it, and how the project relates to neighboring properties.
The plan should be detailed enough to support zoning review and should be consistent with the written application. If the application describes one number of buildings but the plan shows another, or if the narrative promises screening that does not appear on the drawing, the inconsistency can become a point of confusion during the hearing.
Depending on the use, a well-developed plan may need to show:
- Property boundaries and dimensions.
- Existing buildings, roads, driveways, wells, septic systems, and other site features.
- Proposed buildings and their dimensions.
- Setbacks from property lines and roads.
- Parking spaces, loading areas, and internal circulation.
- Driveway connections and access points.
- Fire access and space for emergency vehicles.
- Fences, landscaping, buffers, and screening.
- Outdoor storage, equipment, dumpsters, and lighting.
- Drainage and stormwater features.
- Forest areas and proposed clearing.
- Critical Area features and protective measures.
- Nearby residences, public roads, waterways, and other context relevant to the request.
The exact contents will vary by project. A temporary travel trailer does not require the same site planning as a large poultry house, and a solar energy facility raises different access and screening issues than a commercial building. The goal is not to create a plan full of irrelevant detail. The goal is to show every part of the proposal that could affect zoning findings or neighboring properties.
Match the plan to the way the property will operate
A plan can look orderly on paper and still fail to explain daily operations. Consider the moments when the site will be busiest or most disruptive:
- Where does a delivery truck wait before entering?
- Can two vehicles pass safely on the internal drive?
- Where do employees park?
- How will customers or visitors find the entrance?
- Where will equipment be stored when it is not in use?
- Which lights will remain on after normal operating hours?
- What happens during an emergency or power outage?
- Will noise, odor, dust, or activity extend beyond the building shown on the plan?
These questions are particularly important when the use is large, seasonal, industrial, agricultural, or dependent on frequent truck traffic. They also help you explain the proposal in a way that makes sense to residents who do not read site plans every day.
If the BZA approves a special exception, it may impose conditions involving additional landscaping, traffic access, or site planning. Designing for those issues before the hearing is generally more constructive than waiting for the board to identify them in a condition of approval.
Treat the public hearing as part of the application
The public hearing is not an administrative formality at the end of the process. It is where the applicant’s plans, the county’s review, and the community’s questions come together.
Prepare to explain the proposal in plain language:
1. Identify the property and the requested use.
2. Describe the scale of the project, including buildings, operations, traffic, and hours.
3. Explain why the use requires a special exception under the zoning ordinance.
4. Walk through the site plan, focusing on access, setbacks, parking, screening, drainage, and environmental protections.
5. Address the concerns most likely to affect neighboring properties.
6. Explain any proposed conditions or operating commitments clearly.
7. Answer questions directly and distinguish between what the special exception covers and what will require separate permits.
You are not expected to give a legal argument from memory. You are expected to know your own proposal. Bring the current version of the site plan and make sure the people presenting the project are working from the same documents that were submitted.
Public comments may include support, opposition, questions, or requests for additional protections. A concern about traffic may point to a missing access detail. A question about clearing may reveal that the environmental review has not been explained clearly. A concern about lighting may be addressed through fixture placement, shielding, hours, or a revised plan.
Listening carefully is part of navigating the board. It does not mean accepting every requested change, and it does not mean treating disagreement as hostility. It means separating questions that can be answered with existing information from issues that require a design revision or a county determination.
The BZA may approve a special exception with conditions. Those conditions can address landscaping, traffic access, site planning, and other aspects of the use. Read any approval carefully: the conditions become part of how the project must operate, and later permits may depend on compliance with them.
Know which uses cross the special exception threshold
Some examples make the zoning process easier to understand because they show how the ordinance can attach a special exception requirement to a particular use or scale.
In Somerset County, placing a travel trailer on an Agricultural Residential, or AR, parcel for temporary residence requires a special exception under the identified circumstances. The trailer must be licensed and road-ready, and occupancy is limited to 30 days per calendar year.
That is a narrow, defined use—not a general authorization to place a trailer on an AR parcel as a permanent dwelling. If your intended use goes beyond the stated conditions, you should not assume that the same special exception provision covers it.
Poultry houses are another example of a scale-based threshold. A poultry house with a floor area exceeding 225,000 square feet requires a special exception from the BZA. For a project of that size, the site plan and operational description need to do more than show the building footprint. Traffic, access, landscaping, environmental resources, equipment, and the relationship to nearby properties become central to the review.
Other large or specialized uses can raise similar questions. A proposal involving utility-scale solar, for example, must be considered against county land-use rules and any applicable limits or review requirements. Somerset County has an 1,800-acre cap on utility-scale solar installations, while individual projects may still require their own zoning and environmental review. A proposed 3.9-megawatt solar generating station on West Post Office Road illustrates why the project’s location, scale, and specific approval path matter; the existence of a special exception process does not mean the use is automatically approved.
Use the following comparison as a starting point—not as a substitute for confirming the current ordinance language for your parcel:
| Proposed situation | Why the details matter | Application focus |
|---|---|---|
| Travel trailer on an AR parcel for temporary residence | The use is limited to 30 days per calendar year, and the trailer must be licensed and road-ready | Explain the duration, location, access, and compliance with the specific ordinance provision |
| Poultry house larger than 225,000 square feet | The building crosses a defined floor-area threshold | Document building size, traffic, access, environmental review, landscaping, and operational impacts |
| Large solar installation | Countywide capacity limits and site-specific land-use requirements may apply | Identify the facility’s scale, location, access, screening, clearing, and related approvals |
| Development disturbing 40,000 square feet or more outside the Critical Area | Forest Conservation Ordinance review may be triggered when the project also requires subdivision, grading, or sediment control approval | Complete the forest stand delineation and forest conservation plan process when applicable |
The best application does not simply state that a use is listed in the ordinance. It demonstrates that the actual proposal fits the conditions attached to that use.
Protect the timing of your application
Complete applications for a special exception, site plan approval, or zoning certificate are generally evaluated under the zoning ordinance requirements in effect at the time of application, provided the submission includes the required fees and sufficiently detailed plans.
That makes completeness more than a paperwork preference. A submission that is missing required materials may not receive the same treatment as a complete application. Before filing, confirm that the county considers the packet complete and ask what, if anything, remains outstanding.
Keep a written record of:
- The date the application was submitted.
- The materials included in the original packet.
- Any missing-item notice or request for revisions.
- The date revised plans were delivered.
- Fee payments and receipts.
- Environmental approvals or determinations.
- The scheduled public hearing date.
- Any conditions discussed or imposed by the BZA.
Do not rely on an informal statement that “the application is in.” Ask whether it is complete for processing. If a plan is still missing a forest conservation approval, a required fee, or enough detail for review, the filing may not be ready for the next stage.
At the same time, avoid rushing an incomplete plan simply to establish an early date. A weak submission can create revisions, additional hearings, and uncertainty for the applicant and the surrounding community. The practical goal is a complete application that is clear enough to review and flexible enough to respond to legitimate site concerns.
The strongest special exception applications do not hide the complicated parts. They identify them early, show them on the plan, and give the board a workable path to decision.
Common application mistakes—and how to avoid them
Citing the wrong zoning provision
A request that does not identify the correct ordinance section is difficult to evaluate. Start with the use itself, confirm the zoning district, and make sure the written application describes the request in the same terms used by the ordinance.
Treating a special exception like a guaranteed entitlement
A use may be eligible for consideration and still be denied. The BZA reviews the application through a public hearing and may impose conditions. Eligibility to apply is not the same as approval.
Submitting a site plan that shows only the building
The building footprint is only one part of the proposal. Access, parking, loading, landscaping, drainage, lighting, storage, and environmental features may determine whether the use can function on the parcel.
Leaving forest conservation review until the end
If the project meets the applicable threshold and requires a qualifying subdivision, grading, or sediment control permit, forest stand delineation and forest conservation plan requirements may affect the whole layout. Resolve that question before finalizing the zoning plan.
Describing environmental protections without mapping them
A statement that trees will be preserved is less useful than a plan showing the forest area, the limits of disturbance, and the protective measures. The same principle applies to Critical Area resources and species protection.
Assuming every approval comes from the BZA
A special exception does not replace grading, sediment control, building, environmental, access, or other approvals that may apply. Build a permit map for the project so you know which agency or county office handles each piece.
Forgetting that fees must be paid
Somerset County will not issue a certificate, permit, special exception, or variance until required costs, charges, fees, and expenses have been paid in full. Keep payment records with the application file and confirm whether additional charges arise during review.
Presenting a revised plan without explaining the change
If the plan changes after public notice or technical review, identify what changed and why. A clear revision summary helps the board and the community follow the proposal instead of comparing multiple drawings without guidance.
A practical Somerset County special exception checklist
Use this as a final working review before filing:
- Confirm the parcel location, ownership, and zoning district.
- Define the proposed use, scale, operating schedule, and site activity.
- Identify the specific Somerset County Zoning Ordinance section requiring the special exception.
- Prepare the written application and explain the grounds for the request.
- Confirm the current county filing instructions and fee requirements.
- Prepare a detailed site plan that matches the written description.
- Show access, parking, loading, setbacks, landscaping, screening, lighting, storage, and emergency circulation as applicable.
- Determine whether the project is subject to the Forest Conservation Ordinance.
- Complete a forest stand delineation and forest conservation plan when required.
- Determine whether Chesapeake Bay Critical Area requirements apply.
- Ask whether threatened or endangered species of concern may be affected.
- Include species protection measures or the required explanation if applicable.
- Assemble related technical approvals and supporting documents.
- Pay all required fees and charges.
- Request confirmation that the application is complete.
- Prepare a plain-language presentation for the BZA hearing.
- Anticipate questions about traffic, access, noise, lighting, environmental impacts, and neighborhood compatibility.
- Review any BZA conditions carefully after the decision.
- Track separate permits and approvals required before construction or operation.
The goal is a workable fit, not just a favorable vote
A special exception decision changes more than the status of one application. It can affect traffic patterns, forest edges, views, drainage, business activity, and the community fabric around the parcel. That is why the process asks applicants to show the use in detail and gives the public an opportunity to be heard.
If you are the applicant, begin with the ordinance provision, then build outward: environmental prerequisites, site plan, operating details, public questions, and related permits. If you are a nearby resident, read the application through those same lenses. The most useful comments usually connect a concern to a specific feature of the proposal—an access point, a missing buffer, a clearing limit, a building dimension, or an operating condition.
That is what this means for your block: the special exception process is not only about whether a use is allowed in theory. It is about whether this use, on this land, can be designed and conditioned in a way that works for the applicant and the surrounding community. When the application makes that relationship clear, navigating the board becomes less mysterious and the final decision rests on a much stronger foundation.